5 BRICKWORK
-
- 5.1 SCOPE ; Supply (optional) and lay bricks as required and shown to all walls and pillars inc letterbox. Clean all face brickwork and remove all waste and left over materials from site.
- 5.2 Comply with the following Standards unless otherwise specified
- AS 1640 SAA Brickwork Code
- AS 1225 Burnt Clay and Shale Building Bricks
- AS 1315 Portland Cement
- AS 1316 Masonry Cement
- AS 1465 AS1640 AS A123
- AS 3700 Metal wall ties for Brickwork
- 5.2 Mortar Materials shall be new and delivered in branded and sealed bags and stored under cover and clear of the ground. Colour to be light off white to contrast with bricks.
- 5.3 Use sound and matching bricks of uniform colour and size. Bricks to be fully fired machine made extruded clay bricks with true edges.
- Proprietary Items. BORAL Horizon; Colour Mocca
- Sizes 76 and 50mm Standard 230x110 mm bricks.
- 5.4 Generally use stretcher bond and flush joints with details as shown on drawings.
- 5.4 In temperatures over 30 deg, wet bricks thoroughly 3 hours before use if the following test reveals high absorption. With an eye dropper, apply 20 drops of water to a 25 mm dia circle on a dry face brick. If the absorption time is less than 90 seconds, the bricks require wetting.
- 5.5 Provide damp proof course (optional) and install flashings and weepholes around all openings as per premium brickwork practice.
- Proprietary Items: WEEPA products Pty Ltd (02) 6664 7355
- 5.6 Tie brickwork to Timber frame at 400 vert and 600horiz. centres with proprietary stainless steel ties, ensuring minimal mortar droppings fall on tie thereafter.
- Proprietary Items: MATRIX INDUSTRIES Pty Ltd(02) 6553 2885
- 5.7 Supply and install all required lintels in galvanised steel as specified in Eng Drawings.
- Allow to incorporate and support all structural steel members.
- 5.9 Clean all bricks with approved cleaning agents
- 5.10 Remove from site all broken and discarded bricks, excess brick sand etc. Stack excess fulll bricks on site for proprietor use. (Optional)
-
- Notes:
- -2 story Dwelling
- -Please advise if you can supply scaffolding
- -Drainage works underway.
- -Slab poured Nov, Frame starts Dec
-
-
D M Pamio Pty Ltd
-Did not build to provided specification or drawings. -Failed to install flashing, weepholes and Damp Proof Course in several walls and would not rectify. -Failed to install multiple brick sills according to Building Code of Australia and would not rectify. -Removed installed plumb windows leaving interior reveals projecting 20mm from jamb studs. -Failed to follow instructions on window flashing installation. -Large mortar colour variation. -Walked away mid job without completing works or rectifying faults Buyer beware.
over a year ago ·WW & J Archer - DNC
Brick work for new extension
Brick work for new extension in Bundoora (ground and upper floor).
To brick an additional double storey dwelling at Eaglemont
I am building an additional double storey dwelling to an existing house in...
Bricklaying for new building
11 townhouses in mernda require bricklaying will be ready to go in...
BRICKLAYING - NEW HOME
BRICK LAYING FOR NEW HOME. 17SQ M PLUS GARAGE. BRICKS SUPLLIED