Already a Service Central user? Log in here
Wall removed into kitchen
Building: General Building Work
in Westleigh, NSW 2120
17 January 2012
Want to get a quote on removing a 6-7 meter wall from front room into kitchen of a 70s house in westleigh. could be a structural wall. taping the wall it doesn't seem like a structural wall but am...
Brick carport with tiled roof
Building: Garages & Carports
in Westleigh, NSW 2120
12 December 2011
Carport for 2 cars, 4 brick pillars with tiled roof and fibro ceiling. Gutters, plumbing etc. To be built on existing flat concrete.
Remove load bearing wall and convert garage into living space.
Building: General Building Work
in Westleigh, NSW 2120
9 October 2011
Remove lower level load bearing lounge room wall to open up into garage. Add external sliding doors and brick up old garage door. Engineers drawings are available
Repair both front and back wooden balconies
Building: General Building Work
in Westleigh, NSW 2120
23 January 2011
Replace old timber structure and floor boards of both balconies; Need an assessment of what needs to be replaced;
2 aluminium windows needing instillation + 2 aluminium sliding doors needing installation, and appro
Building: New Building
in Westleigh, NSW 2120
7 March 2008
2 aluminium windows needing instillation + 2 aluminium sliding doors needing installation, and approx 50 m of blueboard replaced.
2 aluminium windows needing instillation + 2 aluminium sliding doors needing installation, and appro
Building: New Building
in Westleigh, NSW 2120
7 March 2008
2 aluminium windows needing instillation + 2 aluminium sliding doors needing installation, and approx 50 m of blueboard replaced.
2 aluminium windows needing instillation + 2 aluminium sliding doors needing installation, and appro
Building: New Building
in Westleigh, NSW 2120
7 March 2008
2 aluminium windows needing instillation + 2 aluminium sliding doors needing installation, and approx 50 m of blueboard replaced.
2 aluminium windows needing instillation + 2 aluminium sliding doors needing installation, and appro
Building: New Building
in Westleigh, NSW 2120
7 March 2008
2 aluminium windows needing instillation + 2 aluminium sliding doors needing installation, and approx 50 m of blueboard replaced.