Adrian requested 3 quotes from Builders in Pascoe Vale
Fair Dinkum Quaker Barn kit needs construction. After a quote, ready to build in 6-8 weeks.
Construction on concrete slab. Good side access and cleared area. It's a 6x7m quaker barn kit with 1x roller door, 1 PA door, 1 window and insulaiton. Has a mezzanine bracket kit and will need yellowtongue boards supplied and fitted. Also will need stairs fitted.
Cheers
Adrian
Rebuilt existing carport/shed
I have an exsisting carport and shed that i would like updated and expanded....
Refurbishing a shed - needs wooden floor & walls installed
Hi there
We have a frame of a shed that requires new walls to be installed...
INSTALLING METAL BARS IN GARAGE
INSTALLING METAL BARS IN GARAGE
Extend existing verandah approx 250mm & replace steel posts with wooden
We need the two metal verandah posts replaced with wooden ones. the flooring...