Jason requested 3 quotes from Builders in Pennant Hills
GARAGE OPENING
Remove garage roller doors
Install temporary props
Remove brick archways and centre pillar
Supply and fit steel lintel
Key in bricks using bricks from the removed pillar to give remaining pillars a square finish
Repair/reinstate eave sheets and gyprock ceiling
FRONT ENTRY ARCHWAY
Remove brick archway
Remove steel arch lintel
Key in bricks using bricks that have been removed to give remaining columns a square finish
LEFT-HAND SIDE GABLE
Remove and replace timber barge boards
All cuts to be primed and sealed
RIGHT-HAND SIDE GABLE - LOWER ROOF
Remove and replace timber barge boards
Remove and replace small section of eave sheet
All cuts to be primed and sealed
RIGHT-HAND SIDE GABLE – SECOND LEVEL
Remove and replace timber barge boards
All cuts to be primed and sealed
Weatherboard home requires blueboard and render
Two story home that requires blue boarding and cement render
Knocking down a few timber posts, need ssupport beam
I am knocking down a few timber posts, need someone to put a beam (approx 4 m...
Renovations
House renovations
Turn a front balcony into a room
Front balcony. Want to enclose it, match the floor height with the adjacent...