Sue requested 3 quotes from Builders in Mill Park
The cross beam at the end of our pergola has rotted away so it needs to be replaced as well as blue board needs to be replaced.
First Class Handyman
MYCHIPPYSOLUTION
The Golden Eagle Design & Construction
Veranda colourbond with flat roof
Veranda colourbond with flat roof
Install of decking subframe over slab
Install of decking subframe over slab... timber supplied. Cutting and fixing...
Roof on an alfresco area
the area that needs to be covered is 5.5 by 5.0. pitched roof looking for quotes
Build a sliding door
The bathroom which is attached to my master bedroom does not have a door. I...