BARRY requested 3 quotes from Carpenters in Birkdale
Require approximately 100m2 of timber decking of which we need a current deck to be repaired or replaced and decking to be laid over current concreted area to the edge of the pool over the coping.
TRD Construction
DeKING Pty Ltd
Charlie The Chippie
Wooden steps that need to replaced.
wooden steps, wooden need replaced,
TIMBER DECKING TO BE BUILT ON UPPER LEVEL OF HIGH RISE HOUSE
TIMBER DECKING TO BE BUILT ON UPPER LEVEL OF HIGH RISE HOUSE
ERECT 6MX6M DECK WITH ROOF IN BACKYARD
ERECT 6MX6M DECK WITH ROOF IN BACKYARD
Decking to be built on upper level of high rise house
Timber or steel framed decking to be built on upper level of a high set...