Richard requested 2 quotes from Carpenters in Box Hill
Two floorboards approx 3 metres long in middle of large room have lifted at the edges. The top tongue on one has cracked and lifted. The floor is 2 years old, 19mm blackbutt timber on a 19mm chipbord base.
Required tasks: Repair boards, sand, finish to match exisitng floor.
HALLWAY SAND AND POLISH 10-15SQM2
HALLWAY SAND AND POLISH 10-15SQM2
Carpets 2 be remvd, floorboards sanded and polished
We have just purchased a 3 bedroom house. however, settlement isn't until...
Repair and replace tongue and groove floorboards
Existing tongue and groove pine flooring 19mm profile. Need to remove...
Floorboards require repair
Incorrectly laid floorboards approx 5 metres long in middle of large room...