Darren requested 2 quotes from Carpenters in Heathmont
Remove existing floor and install new floor, approx 25sqm in sqare room. This is on floor joists and has to stay on joists to be level with adjoining rooms. Using 85mm Tasmanian Oak.(labour only)
DRY ROT IN TOILET
DRY ROT IN TOILET FLOOR BOARDS- IS GETTING TOILET REPLACED AFTER DRY ROT IS...
Weatherboard house restumped some time ago. Subfloor needs to be checked
Relevel subfloor for squeaky floorboards
Place36 square metres of laminate flooring
Remove existing carpet to expose MDF loor
Timber Ceilings
To Lay solid Timber flooring onto a ceiling approximatly 25 sqm's angles form...