Matt requested 3 quotes from Carpenters in Westgarth
Existing bedroom door needs planing due to new rug on polished floor boards which prevent opening/closing. The door also needs to be attached to the opposite frame as we need it to open the other way and so exisitng hinge gaps need to be filled with thin timber cut to size before painting
Priority One Property Maintenance
Entry Door Installation
Install front door consisting of two side panels and one 900mm wide door and...
WOODEN PANEL DOOR NEEDS FIXING-HINGES BROKEN
WOODEN PANEL DOOR NEEDS FIXING-HINGES BROKEN
Internal cavity sliding doors
I am looking to change 3 existing bathroom and laundry doors to internal...
Small cupboard door put on a workstation
I need a small cupboard door put on a workstation in an office.