Adam requested 3 quotes from Carpenters in Airport West
Hello - I have a utility room with lowered floor and low ceiling. Room size is 315cm by 180cm (5.67m2). I would like the following done.
1. Install joints on concrete slab and lay floor boards. Raise floor level from concrete 15cm.
2. Raise ceiling 30cm
Also want to knock a few walls down on side and front of utility room.
Would prefer quotes to occur at my house at Thursday 17th Jan in the morning (I have time off work)
Thanks
Adam
Demcon Australia
Haberfield Holdings Pty Ltd
Carpernter to replace small area of floor boards
Hello there is small section of the floorboards that need to be replaced in...
Replace floor in kitchen
Current tiles have been cemented directly to floorboards. I need this removed...
Remove carpet and install supplied timber flooring to 3 bed rooms
Remove carpet and install supplied timber flooring to 3 bed rooms
New timber floor installed x4 rooms old ones removed
We have a current floor that will need to be removed and a new floor layed. 4...