Paul requested 2 quotes from Concreters in Sunshine North
Slab in factory 10mt * 6 mt to be cut for excavation. approx thickness 75mm depth.
low mpa concrete(old).
removal of material to 1 mt depth by excavation.backhoe access avaliable.
Romoval of concrete
need aprox 5 square meters of concrete removed. 1 square meter is already cut.
10m x 3m concrete to be removed. No bobcat access. Quote break and remove separately pls
10m x 3m of concrete to e broken up. Currently has no cracks so may be...
Concrete removal
Removal of concrete from driveway
Concrete removal
removal of concrete 50% alredy broken up ready to remove
reasonable access