10x6m pof concrete removed from factory

Paul requested 2 quotes from Concreters in Sunshine North

  Slab in factory 10mt * 6 mt to be cut for excavation. approx thickness 75mm depth.
low mpa concrete(old).

removal of material to 1 mt depth by excavation.backhoe access avaliable.

Quote Details

  • Suburb Sunshine North, VIC 3020
  • Specialisation Concrete Removal
  • Date Listed 15 Dec 2008 - 3:34 pm

Similar Quote Requests

Romoval of concrete
need aprox 5 square meters of concrete removed. 1 square meter is already cut.

10m x 3m concrete to be removed. No bobcat access. Quote break and remove separately pls
10m x 3m of concrete to e broken up. Currently has no cracks so may be...

Concrete removal
Removal of concrete from driveway

Concrete removal
removal of concrete 50% alredy broken up ready to remove reasonable access