Andrew requested 3 quotes from Concreters in Avonsleigh
Approx 40 sqm of concrete needs adhesive (from hardware flooring being stuck down) removed and a floor levelling compound applied ready for a vinyl floor to go down.
80sq mtrs of blue stone lipped and group stained needs grinding
new 80sq mtrs of blue stone lipped and group stained needs grinding un sealed
Concrcete patio
patio is 5mx1.5m
Concreting of a driveway approx 80 square meters
Approx 80 sq meters of concrete - we like the look of pebbles mixed into the...
POLISH CONCRETE FLOORING 100SQM
POLISH CONCRETE FLOORING 100SQM