Mario requested 3 quotes from Concreters in Lancefield
Job 1 - provide a shed floor dimentions 13.8 m wide x 7.2 m long. this to be done in approx 4-6 weeks..
job 2 - this culvert job we want done now, is to stabilise the entrance and exit of an existing concrete pipe culvert (est 800mm diameter) which is under the access road in the property. it drains seasonal storm water underneath our access road.
i suggest a 200mm beam above each edge of the pipe to define the pipe and road edge. it will also need an 'apron' tapering out from each side and under the existing pipe to guide the water into and out of the pipe.
Lay footings, stumps, and sub flooring site clear have plans and permits
Onwer builder
strip footings and stumps
Foundation for shed
laying concrete slap for 12 by 24 m shed asap
Concrete Foundation/house slab
Concrete house slab to be constructed in gisborne, house is approx slab...
Whole dug inground.Approx40m in length x16 mt in width which req sealing.
Whole dug inground.Approx40m in length x16 mt in width which req sealing.4...