Concrete slabs poured

Cameron requested 3 quotes from Concreters in Lorne

  The steel structure will be complete next week, then I need the 3 suspended slabs poured. There is about 200m2 at 100mm deep, so around 20m3 of 32mpa concrete. The site is on a slope, but the slabs are only a few metres from the top road which overlooks the site, so very accessible. The steel will need to be laid in as per engineers plans etc.

In around 2-3 weeks.

Can pay cash.

Thanks Cameron :)

Quote Details

  • Suburb Lorne, VIC 3232
  • Specialisation General Concreting
  • Date Listed 30 Oct 2014 - 9:41 pm

Similar Quote Requests

Lay new driveway
Remove old concrete driveway strips and lay new driveway with drainage

Concrete path around home
Newly built home requires concrete path around house and concrete driveway to...

Concrete House Slabs
We have 5 house slabs due to start over the next 6 weeks. 1 house slab in...

Backyard concrete pathway
Require quotes for a concrete pathway to connect rear paved area to side gate...