John requested 3 quotes from Concreters in Ringwood North
Form, reinforce and pour 6.8m x 3.6m x 100mm carport floor slab in charcoal coloured concrete with standard finish. 50mm fall from rear to front. 50mm spoon drain is needed on back and one side graded to existing pit. Also about 60 square metres of footpath paving.
Total Trade Constructions
Around the bay concreting and landscaping
Levi Paving
Backyard of a unit
We would like a small border. Currently there are stones there and they can...
Concrete Drive, Alfresco and Paths Area
Concrete the DriveWay and path Leaving to the Porch, Path along the North and...
Concrete driveway and pathway and rear of garage.
We considering undertaken home improvements and would like to obtain a quote...
Polished concrete in small toilet 1sqm laid over exist tiles
Hi,
would like a quote for polished concrete laid over existing tiles in...