Nathan requested 3 quotes from Concreters in Colebee
Require concreting works for raft slab for new dwelling, including all form working, steelwork, formwork and pier filling. Slab is approx 300m2, requires 32MPa concrete and some drop edge beams. Site will be stripped, cut and filled to required levels, all footings and piers will be excavated.
Concrete slabe for second dwelling n garage
GRanny flat plus garage plus car port at front.
Slab for shed & gazebo 3mx3m & 3mx6m easy access
I need a slab on a level ground for a 3x3m shed and a 3m x 6m gazebo easy...
Rmve grass, build cncrte path 30-40ft & slab 6-7ft for wheelchair access
a slab about 6-7 ft to be built to get in to the car , a path 30-40 ft to be...
Lay cement slab approx 3.5mtr2 for new shed
Approx 3.5 by 3.5 cement slab to be laid for shed