EXCAVATION,PREP,FORMWORK & REINFORCING. HAS PLANS

GRAHAM requested 3 quotes from Concreters in Reservoir

  EXCAVATION/REMOVAL OF DEBRIS; PREP, FORMWORK & REINFORCING FOR NEW PURPOSE-BUILT GARAGE SLAB (FULL PLANS AVAILABLE); ALSO PATTERNED CONCRETE DRIVE;

Quote Details

  • Suburb Reservoir, VIC 3073
  • Specialisation House Slabs
  • Date Listed 11 Nov 2006 - 2:09 pm

Similar Quote Requests

A Concrete Slab for a new house
A 150 mm Thick concrete Stair Slab and Strip Footing. Drawings are available.

100mm reinforced concrete floor for 2 freezer rms with ramp for frklift/tot area 26m2
100mm reinforced concrete floor for two freezer rooms with ramp for forklift....

Slab foundation
laying slab foundation for new home engineering plans available upon request...

Excavate and pour concrete slab within existing garage. about 35m2.
Job requires excavation of paving / loose maerial to existing garage. walls...