Steve requested 3 quotes from Concreters in Altona
Newly built house requires a driveway and paths in Exposed Aggregate Concrete. I also require concreting out the back in a stencilled concrete or coloured concrete finished. Total area approx. 100m2.
Levi Paving
Garage Slab Required
I require a 3.5m x 6m Garage Slab with 6 footings
I also require a further...
Concrete driveway
Pour slab of concrete to extend existing concrete driveway - approximately 27...
Concrete driveway
Pour slab of concrete to extend existing concrete driveway - approximately 27...
Nearly completed house requires new driveway and pathways.
Front driveway and pathways in Exposed Aggregate. Also require pathways at...