Kevin requested 2 quotes from Concreters in Maidstone
6 x 8 H class concrete slab for a double story garage/studio. Direct access to site for excavation/concreting equipment. Plans available during site inspection. Slab is marked out by surveyors. Payment in cash if required. Job to start in 2 weeks. Job awarded to contractor who is experienced and prompt with quote. Must complete building surveyors inspection prior to pour. Very easy job. Can also quote removal of excavation soil if want to.
VINCENT FILOMENO PTY LTD
Blacrete Constructions Pty Ltd
Concrete slab, pouring, form work the whole lot for 2 x townhouses
Concrete slab for two townhouses in braybrook.
Including site excavation,...
Concrete slab, pouring, form work the whole lot for 2 x townhouses
Concrete slab for two townhouses in braybrook.
Including site excavation,...
Build a concrete base of 1.4m by 2.2 meter with cage
we need to have a concrete base of 1.4m by 2.2m with alesat 150mm depth. We...
Concrete slab (f62) for garage 6x3.6m & watertank slab 2.3 x 08m site clear
I would like a quote for the following work:
- 6m x 3.6m 100mm f62 slab...