Malcolm requested 3 quotes from Concreters in St Andrews Beach
Slab will need to support steel structure with glass roof. Site is level but has not been prepared. Some removal of grass will be needed.
Sharps Concreting
All Safe Foundations
CONCRETE BACK PATIO AREA.
CONCRETE BACK PATIO AREA.
Need to concrete cellar which has been dug out
Need to concrete cellar with has been dug out
New split level home of 50 squares requires concrete and footings
Approx 80 sq meters of concrete
footings to engineering drawings
Concrete slab for 3 units. Approx 40 square mts
Need concrete slab for 3 units. Approx 40 square mts