Violeta requested 3 quotes from Concreters in Truganina
we have a 240mm slab over hang that requires. The piece of slab that is 240mm long has to be cut away. You need to cut 300mm extra so that you can install new edge beam at the location where the beam was supposed to be in the first place. You will need to drill and epoxy n12-400 bars into slab and 3N-16 bars to adjoining footings to ensure continuation intact.