Due to a council enforcement notice i have an engineer's report on what is required to repair a front block retaining wall/fence in 3 sections of 2.4, 4.1 and 4.1 m in lenth (1.2 m high).
a number of concrete piers (about 8) need to be bored into the ground behind the wall, and then holes need to be drilled through the wall to the piers, after which steel bolts are to be inserted to support the wall.
also a single brick wall (18m in length) needs to removed down to a height of 500mm (from about 1.2m) and sealed again with mortar along the top of the wall.
the total job then needs to then be certified for submission to the council.
Paul Conoley Bricklaying
Replace existing wooden retaining wall with brick/concrete wall
Remove and replace existing 20 metre wooden sleeper retaining wall with...
Replace existing retaining wall with Concrete block wall
Replace existing backyard swimming pool wooden sleeper retaining wall with...
Construction of 30m of garden edging plus 2 m path to match existing
Length of free-form garden bed edging 180 x 100mm with 12mm reinforcing rod...
Pavers and concrete
Remove existing timber retaining wall 1.0 to 0.3. metre high by 11 metre...