Tim requested 3 quotes from Concreters in Oakleigh
Repair cracks in concrete footpath and crossover to council standard (Monash) after demolition works. 7 x bays, 2 x sides of crossover
9 - 10 SQ METER PATH FOR BACKYARD
9 - 10 SQ METER PATH FOR BACKYARD
TO DO A CROSS-OVER TO THE FOOT PATH TO DRIVEWAY
TO DO A CROSS-OVER TO THE FOOT PATH TO DRIVEWAY
AROUND CLOTHESLINE AREA
AROUND CLOTHESLINE AREA
Concrete path, 7 square metres
Lay a concrete path as a base for tiling. Dimensions are 1.5 m wide and 4.5 m...