Repair damage to bitumen path

Rod requested 3 quotes from Concreters in Research

  path has been damaged by tree roots. bitumen needs to be repaired once roots have been removed

Quote Details

  • Suburb Research, VIC 3095
  • Specialisation Asphalt
  • Date Listed 15 Jan 2014 - 9:29 am

Similar Quote Requests

1 x 15mtrs asphalt to be poured into a pathway
I am looking at creating an ashphelt path - 1 metre wide, 15 metres in length.

Asphalt top section of driveway to widen.
Top section of the driveway is to be widened on both sides. Areas to be...

Asphalt crossover
Require a new asphalt crossover

Ashphalt Parking Bay 16mtr Birck Edge
Laying of Ashphalt 16mtr sq 40mm Parking Bay Brick edge,& Rock Already preped...