Nickolas requested 3 quotes from Construction & Property Services Experts in Keilor Park
We have a 32 square metre test laboratory we are building on an existing commercial warehouse mezzanine floor (unrated load - est 1.5kPa or less).
We wish to be able to handle a 2.5kPa maximum static load by installation of steel reinforcements and columns internal to existing false ceiling.
Require structural engineer to review and provide design options with minimal disruption to existing and continuing operations in areas below mezzanine floor.
Structural engineer inspection required for house cracks and underpinning
Require quote for a structural engineer to inspect inside/outside of house...
Engineering job
the small extension of the house need engineering certify for building...
Structural Engineering for 3 Unit Development
Structural engineering for a 3 x Three bedroom (double storey) unit...
Soil test and plan for underpinning
I need a geotecnical report and plans for underpinning of a 1960's house on...