James requested 3 quotes from Curtains And Blinds Professionals in South Melbourne
I require white Plantation Shutters for 1 front window. The measurements are approx 2.8m x 1.4m. The supplier will need to supply and install the shutters within 3 weeks maximum. Time is critical and cannot be late as I will no longer have access to the place after 3 weeks. Only bid if you can meet the 3 week deadline, this means the window has to be fully installed within 3 weeks.
Thanks for your time. Happy to provide feedback once job is complete.
How much will it cost and can you deliver in that timeframe?
Cheers,
Kane
Fabric Creations
These guys provided an excellent service.
Repair plantation blinds (damaged joins only shutters intact)
plastic inserts have been broken on two of the shutters either side. require...
Supply and install plantation shutters
supply and install plantation shutters
Provide and install Plantation Shutters
Provide and install Plantation Shutters to 7 windows. ASAP
5 Indoor timber shutters for security & as window furnishing
New indoor timber plantation shutters. required for security and as a window...