Mihir requested 0 quotes from Draftsmen in Truganina
Preparation and documentation of followed drawing with care.
- preparation of ga drawing (plan, elevation, sections) for approval purpose, after approval, make a tender drawing, after tender stage come out for working drawing, site measurement drawing, completed work drawing for sewage pumping station.
- in sewage pumping station required other drawings are listed below.
o electrical layout drawing, switch panel drawing
o pumps and other mechanical fittings drawing with appropriate measurements.
o rising main line drawing
o valve drawings, required gates drawing
- preparation of design drawing of sewerage network, after approval of design drawing make a tender purpose drawing, after approval of tender, make execution drawing for each area of sewerage network and timely provide hard/soft copies whenever required
- in sewerage drawing related typical drawing with sewerage network are listed below
o standard round manhole drawing,
o excavation drawing,
o shoring strutting drawing,
o scrapper manhole drawing,
o manhole frame and cover drawing,
o fiber reinforced plastic (frp) steps drawing,
o ventilating column drawing etc., are provided hard/soft copies whenever require.
- preparation and modification in storm water drainage system drawings.
other skills:
- to resolve the issues arose at field visits, if required
- able to effectively handle multi task job including quantity measures.
- proficient in making working drawings.
Pergola exension
Extension to current pergola, using similar materials as current structure
Measure bridge/gantry crane and create AutoCAD or SoildWorks drawing
Measure 14.5m span bridge/gantry crane (now at ground level), and create...
AutoCAD or SolidWorks factory drawing for Town Planning Application
Prepare AutoCAD or SolidWorks factory drawing for Town Planning Application....
Plans to sub-divide land and build second dwelling
Needs syrveyors report and council approval.