3 phase upgrade, plus 4 double GPO's and 8 down lights

Bruce requested 3 quotes from Electricians in Warrandyte

  Installation of 16mm2 3 phase mains from new underground pit, also the installation of main earth and earth stake as well as a new meter box and panel and main 17 circuit breaker switchboard.
Installation of 4 double GPO's and 8 downlights also required.
If job done economically and well, further work will be required.

Electricians that Responded

Current Connections

Depir Electrical Services

OTS Electrical Solutions

Quote Details

  • Suburb Warrandyte, VIC 3113
  • Specialisation Switchboards
  • Date Listed 9 Jul 2009 - 4:20 pm

Similar Quote Requests

FIX A SWITCH BOARD
FIRE IN SWITCH BOARD FOR UNDER FLOOR HEATING NEED REPLACING OR FIXING URGENT

Problem with 2 fuse boxes. 1 isn't working,1 clicks off. URGENT
One of the fuse boxes on side of house isn't working. Other fuse box security...

Investigate/inspect switchboard as receiving very low amount of power.
Investigate/inspect switchboard as receiving very low amount of power,only...

Replace the switch power board,easy acccess
Need someone to upgrade the switch board, plugs, lights etc...