Electrical rewiring of existing light switches

Matthew requested 4 quotes from Electricians in Moorabbin

  1. Remove single switch for outside power point. (switch only, keep power point connected to mains)

2. Connect OLEX cable from wired light to mains (1m run)

3. Relocate 1 x single switch (70cm) to existing double power point to existing single fixture (double power point) to produce single fixture (double power point with switch)

4. Relocate 1 x double switch (1.2m) and 2 x single switches (10cm) to existing single fixture ( 4 gang switch) to produce single fixture (five gang switch)

5. Relocate 1 x single switch (1.5m) to existing single fixture (four gang switch) to produce single fixture (5 gang switch)

6. Install new power point (slimline double power point)
All points accessible through internal access to roof. Manhole is relatively narrow.

All new switches to be installed will be provided. (4 gang, 5 gang, double power with switch, slimline power point). Estimate 2-3 hours of effort.

Electricians that Responded

Sultan Electri-Call

MEGA ELECTRICAL GROUP PTY LTD

J.L Hutt Electrical

AGGY Pty Ltd

Quote Details

  • Suburb Moorabbin, VIC 3189
  • Specialisation General Electrical
  • Date Listed 13 Jun 2019 - 10:52 am

Similar Quote Requests

Insulation audit
we had insulation installed under the insulation grant and would like to have...

-upgrade mains-upgrade meter box-up grade switch board-upgrade earth system-all separate RCD's for c
-upgrade mains -upgrade meter box -up grade switch board -upgrade earth...

Electrical work
2 double powerpoints installed

Too many things wired through one fuse, fuses keep blowing
Whenever we have too many appliances running a fuse trips in the fuse box...