Install 3 phase cct to UPS, balance phases

Wayne requested 3 quotes from Electricians in Northmead

  Install 3 phase 35A power circuit from distribution board to comms rack. Cable run is about 8m.
Terminate with 40A breaker at switch
Terminate on comms rack with 3 phase lockable isolator.
Relocate 3 existing ccts in distribution board to make room for new cct.
Balance phases at distribution board.
Terminate power on UPS and bypass unit and change plugs on rack powerstrips to suit.
Work must be done on a Saturday, prefer 10 October.