Already a Service Central user? Log in here
Registered Service Central users have access to powerful filtering of the Jobs Board, giving you the ability to rapidly sift and filter through all of the jobs available on Service Central.
Sign up now (it's free) and start using it!
Already a Service Central user? Log in here
Supply & install 36 module sub load centre ++
Electricians: General Electrical
in Gumeracha, SA 5233
9 January 2020
Hide Details
Supply and install 36 module sub load centre from main load centre. Cable is run to service room and earth pin is installed, need to run around 3m to earth pin and drill through core filled wall... Supply and install 36 module sub load centre from main load centre. Cable is run to service room and earth pin is installed, need to run around 3m to earth pin and drill through core filled wall (190mm), mount load centre on core filled wall in a service room. Supply and install 2 x mains switches, 2 x RCBO's, 2 x DIN rail mount GPO's
Sign up to receive news, updates and special deals!
© 2005- Service Central