New electrical fit-out: 2 bedroom unit in Vermont

Simone requested 4 quotes from Electricians in Vermont

  Required: electrical fit out for renovation of 2 bedroom unit.
The plasterboard to all external walls has been removed (there is no insulation or sarking) Also the bathroom and kitchen walls are without plaster board. There is easy access underneath the house (1.5-.5m height).
- all light fittings incl. motion sensor and exhaust fan are supplied by owner.
Scope of work:
1. replace old switch board (add new circuits; Fuses/Circuit Breakers/Residual Current Devices
2.study: 2x double GPO, 1x pendant, 1x telephone connection point(existing wiring), 1x light switch.
3.bathroom: 1 self-closing exhaust fan, 2 downlights, 1 wall mounted light fitting, 2x double GPO, 1 x light switch.
4.Kitchen: wiring to underbench oven, cooktop, 3x single GPO, 3x double GPO, 1x ceiling mounted spot light, 1x light switch.
5.dining/living: 2x pendant light, 4x downlights, 3x wall mounted light fittings, 1x telephone connection, 1x TV connection point (optional new tv cable), 1x light switch, 4x double GPO.
5.corridor: 2x pendant, 2x light switches; 2 way
6.entry: flash mounted external light + motion sensor, 2x external wall mounted light fitting.
7.garden/garage: 3x external wall mounted light fittings, 2x light switch - 2way, 1x external GPO.
An electrical plan and a schedule of the light fittings are available on request.

Electricians that Responded

Snapper Electrical Services

DT Electrical and Data Communications

BSW Electrical Services Pty Ltd

Quote Details

  • Suburb Vermont, VIC 3133
  • Specialisation Electrical Renovations
  • Date Listed 13 Nov 2010 - 1:01 pm

Similar Quote Requests

A rewire of my 2 bedroom weatherboard home
I need the mains power upgraded, a new switchboard, 8 new PowerPoints, all...

New light fittings to be installed and one to be fixed
1. Replace ceiling fan with light in kitchen area 2. Install exterior down...

Elec meter moved, update switchboard with circ breakers,13 dwnlights changed over etc.
I would like to have my electrical meters moved to a different location for...

Disconnect kitchen appliances on fri2may and reconnect on monday 5may
kitchen being renovated. will need to disconnect oven and re-site. New power...