Jacky requested 2 quotes from Electricians in Baulkham Hills
PIC 1 is the photo for my current meter:
http://users.tpg.com.au/jackzo01/1.jpg
Currently, the solar panel has been installed on the roof. Solar panel safety switch (top wide one) has been installed in the switch board. Off peak meter and relay have been installed for solar hot water system.
I believe that the following task need to be done.
1. Relocated off peak switch and solar hot water safety switch from zone 1 to 2
2. Install solar meter in zone 1.
3. Hard wired pool pump from pump’s room (around 15m to 20m away) to meter box. It is very easy to access under the house.
4. Install a new safety switch zone 2 for the pool pump.
I have permission to install the meter from power supplier.
The PIC2 is the job once it is done.
http://users.tpg.com.au/jackzo01/2.jpg
InterElectrical
Re-wire Solar water heater booster
Currently connected to main meter. Was previously connected to off-peak. I...
INSTALLATION OF SECOND PHONE LINE
SECOND PHONE LINE TO BE INSTALLED
TELEPHONE LINE TO BE INSTALLED
CABLE NEEDS REPLACING
REMOVE ELECTRICITY
REMOVE SERVICE FROM GARAGE POSSIBILITY OF NEW POWER POINT