Rough in and fit out of a new house

Chris requested 3 quotes from Electricians in Yokine

  1. A power supply for the build, off the existing meter – approx 16m of cable, 2 WP power points, RCD. Approx installation date – second half of Jan 2009
2. Rough in. Approx date – February 2009
3. Fit-out. Approx date – March 2009
4. Connection from the authority service point along the water pipe trench, approx distance 50m. Approx date – March/April 2009
5. Optional - installation of 1.5 kW PV panels

Quote Details

  • Suburb Yokine, WA 6060
  • Specialisation New Home Electrical
  • Date Listed 10 Dec 2008 - 10:20 am

Similar Quote Requests

New granny flat electrical
Electric for granny flat which is going to be built

Remove ceiling fans, install lights
Remove 3 ceiling fans and replace with lights. Install 2 x bathroom/heat lights

Needing a new light installed in the ceiling.
Needing a new light installed in the ceiling.

1 Hardwired smoke alarm, 2 RCD's
3 Bedroom house with rooms all at same end of house for smoke alarm. As per...