Wendy requested 3 quotes from Electricians in Kew
Old ceramic switchboard needs upgrading to be compliant with current standards (asap). A couple of powerpoints to be moved in the kitchen and bathroom (December time frame). Kitchen appliances (oven and rangehood) and lighting to be installed in the new year (January/February 2015). Located on 3rd floor block of units.
brickhill electrical contractors
Trew Electrical Contractors
Electrical work.
Wiring for new kitchen and pantry:
power points
halogen lights and...
3 x Install lights
1 x install new fitting in place of existing
1 x install new light (with...
Replace existing smoke alarm
Replace existing Clipsal Lifesaver with a Clipsal 755PSMA2. Tradesman needs...
Electrical work
Replacing 8 baton lights
Installing 2 x ceiling fans (pre wired)
Installing...