20 holes 600mill deep dug for decking foundation.

Deo requested 3 quotes from Excavation Experts in Hampton Park

  20 holes 600mill deep dug for decking foundation.

Excavation Experts that Responded

Casey Earthworks

Quote Details

  • Suburb Hampton Park, VIC 3976
  • Specialisation Post Hole Digging
  • Date Listed 22 Nov 2010 - 9:53 am

Similar Quote Requests

35 post holes dug in the 14th august. 350mm to 600mm
35 post holes need digging. Access for mini bobcat size 350 400 and 600 Site...

Two holes for sleeper wall posts
Current sleeper wall in front garden is showing signs of leaning. I want to...

Digging hole for placing pergola
digging hole for placing pergola

Post-holes for retaining wall
Need 9 post holes dug for retaining wall. The need to be quite deep, between...