Anthony requested 2 quotes from Excavation Experts in Point Cook
We require a hole dug for our pool. 5.8 x 3.6 x 1.0 deep.
Access is via rear roller door wich is approx.
2.7H x 2.4W. The hole is to be dug right behind roller door. Access is tight as there are 2 brick walls & a fence to contend with. Total working area is 7.0m x 4.5m. Ground is firm (Clay)
Kelgar Minidiggers and Garden Services
Inspirational Home Enterprises Pty Ltd
Inground pool to be removed and filled in to make way for lawn
inground pool approx 8mtrs long by 4 to 5 mtrs wide to be excavated and...
Excavation
We are building a new house and require excavation for site preparation.
Cut concrete& crush rock to be lifted, removed &disposed off. 100 mm thick
In Backyard for planting trees, already cut concrete & crush rock to be...
Trench and remove soil at front and back yard
I need use mini digger to do the trench.