Colin requested 3 quotes from Excavation Experts in Taylors Hill
Excavate top soil from back yard and lay and compact new topsoil - take old soil to tip
Remove about 8m of lawn area & brickpaving to prepare for a pergola
We need to take out about 8 to 10 metres of lawn area and remove brick paving...
Excavation (150mm approx) & soil to be removed
Excavation of the following sizes down 150mm approx, plus want the soil/Dirt...
Front and side natures strip requires digging up and backyard levelled
Natures strip needs to be dug up in preparation for landscaping. Backyard...
Remove rock from building site, one truck load
a truck load of rock to be removed off site , no digging required. one...