Excavation and removal of nature strip topsoil 19m long x 2m wide 5-10cm depth

Christian requested 2 quotes from Excavation Experts in Point Cook

  I require topsoil/fill to be dug out and removed from site from my nature strip and a portion of my front yard.

the nature strip is approx 19m long x 2m wide and i require it excavated to a depth of approx 5-10cm so that i can lay crushed rock and 20mm tuscan rocks. there is a young gum tree in the middle of the nature strip that cannot be removed.

the portion of the front lawn to be excavated is approx 9m x 3m and i require it excavated to a depth of 10cm so that soil, irrigation tubing and grass can be laid.

all excavated soil should be removed from the site by the contractor and disposed of.

Excavation Experts that Responded

JDK Bobcat & Tipper Hire Services

Excellent, prompt response, great service and a great price. Thanks very much!

· over a year ago

Knee's Earthmoving

Quote Details

  • Suburb Point Cook, VIC 3030
  • Specialisation Earth-Moving
  • Date Listed 3 Jun 2008 - 10:02 am

Similar Quote Requests

BOBCAT TO LEVEL BACK YARD
BOBCAT TO LEVEL BACKYARD

Front yard cleared soil needs removing 2-3 inches below current level
I want my front yard cleared, only small yard & i have recieved advice a...

TO CLEAR AND REMOVE DIRT TO PREPARE FOR A DRIVEWAY
TO CLEAR AND REMOVE DIRT TO PREPARE FOR A DRIVEWAY

Bobcat opertor for a shed 7 mtrs x4.5mtrs and dirt cleared out
bobcat operator for a shed 7mtrsx4.5mtrs