James requested 3 quotes from Excavation Experts in Heathmont
I need a semi above ground pool and timber deck removed from a backyard with easy access. The hole then needs to be filled
Pool Excavation
We require a pool excavation for a 14 x6m pool with some soil to remain on...
BOBCAT TO REMOVE DIRT FROM BACKYARD AND FRONTYARD
BOBCAT REQUIRED TO REMOVE DIRT FROM BACK YARD TO INSTALL RETAINING WALL AND...
SITE CUT FOR SHED AND FLATTENING SITE
SITE TO BE CUT FOR SHED AND FLATTENING O GROUND FOR HORSE TRAINING AREA
EXCAVATE EXISTING CONCRETE AND EARTH
APPROX 75 SQUARE METRES