Shaun requested 3 quotes from Excavation Experts in Ringwood North
Remove and stockpile top soil from approximately 50 sqm area.
Level ground,
Replace topsoil.
Dirt to be remved aprox 6mts x 3mtrs
easy to get to i hve a area aprox 5meters x 3meters i have rotory hoed it...
Re-grading/Landscaping/Excavation
(a) External ground levels are recommended to be excavated to the level of...
Small backyard levelled and top soil spread
Need backyard levelled and top soil spread ready for lawn
Excavation
excavate and remove soil (mud at the moment) from front yard in preparation...