John requested 3 quotes from Excavation Experts in Campsie
Excavator to level and backfill about 60sqm in preparation for concrete slab. Dig sewer trench 5m, dig stormwater trench 15m. Drill 6 x 300mm holes, 1.2m deep for posts to hold treated timber retaining wall.
Lifestyle designs and Constructions Pty Ltd
Excavation, back yard needs to be leveled. Medium to large job.
back yard needs to be leveled. Rock and soil. Need teseting. Medium to large...
EXCAVATION: FOOTING DUG, LEVELING FOR TURFING
FOOTING DUG, LEVELING WORK TO PREPARE FOR TURFING, EXCAVATION LEVELING FOR...
Approx 70sqm earth moved and lossened for residentrial
Earth moved and loosened for back and front of residential. approx 70sqm