Paul requested 3 quotes from Excavation Experts in Pakenham
Need to raise lower areas with soil and to remove low lying areas where water sits. Slight slop needs leveling.
Burd Excavations
Wolf70 Excavations
EARTH MOVING -DINGO HIRE
EARTHMOVING -DINGO HIRE
Level yard
Remove 2-3 inches soil to level yard,use soil to level another area.All in...
Cut new driveway
We need a 75m x 3m gravel driveway cut so that trucks have access to our...
Driveway needs fixing
Long driveway, gravel. good base but needs reshaping as tracks worn and ? an...