Robert requested 3 quotes from Excavation Experts in Hoppers Crossing
inground pool approx 8mtrs long by 4 to 5 mtrs wide to be excavated and filled in also a small spa at the end to be removed
Excavation
We are building a new house and require excavation for site preparation.
Cut concrete& crush rock to be lifted, removed &disposed off. 100 mm thick
In Backyard for planting trees, already cut concrete & crush rock to be...
Dig hole for inground pool
We require a hole dug for our pool. 5.8 x 3.6 x 1.0 deep.
Access is via rear...
Trench and remove soil at front and back yard
I need use mini digger to do the trench.