Level 9*4m part of the block and dig stump holes for retaining wall

Joe requested 3 quotes from Excavation Experts in Doncaster East

  I'm building a deck and require a 9x4m area levelled. Stump holes dug for the foundations and retaining wall.About a day and a half work. Excess soil removed. Access is via the garage. Work to start ASAP

Excavation Experts that Responded

Confined Cut Earth Moving

Quote Details

  • Suburb Doncaster East, VIC 3109
  • Specialisation Earth-Moving
  • Date Listed 24 Oct 2012 - 9:04 am

Similar Quote Requests

Excavator for crossover this friday 17th of october-
Ripping up a crossover and then taking a load of concrete to clayton tip....

Excavation of crossover
need a crossover cut out in malvern, concrete load taken to the tip. this...

Excavating
Concrete removal and site cut

DIG FOOTINGS FOR 3 TOWNHOUSES
DIG FOOTINGS FOR 3 TOWNHOUSES AND BREAK SOME ROCK