Victoria requested 3 quotes from Excavation Experts in Wyndham Vale
I need around 15cm of soil moved from one side of the yard to the other side building up an existing retaining wall. Also adding some of this soil into some planter boxes already created.
The rubble doesn't have to be picked up. We can remove if it will make the job cheaper.
Small job maybe a few hours of work.
Phone number is work number 9-5pm
Thanks for your interest!
Extreme Bobcat & Truck Hire
BOBCAT TO LEVEL BACK YARD
BOBCAT TO LEVEL BACKYARD
Front yard cleared soil needs removing 2-3 inches below current level
I want my front yard cleared, only small yard & i have recieved advice a...
TO CLEAR AND REMOVE DIRT TO PREPARE FOR A DRIVEWAY
TO CLEAR AND REMOVE DIRT TO PREPARE FOR A DRIVEWAY
Bobcat opertor for a shed 7 mtrs x4.5mtrs and dirt cleared out
bobcat operator for a shed 7mtrsx4.5mtrs