Need 3 holes dug and soil moved

Mark requested 3 quotes from Excavation Experts in Sunbury

  I need 3 holes dug for retaining wall. Holes will be approx 400 x 1200. Area will also need to be levelled and a little excavation. There will also be about 5 cubic metres of soil to be moved from the front yard to the back yard

Excavation Experts that Responded

Bramich Constructions Pty Ltd

Underground Service Solutions

Dig On Excavations Pty Ltd

Quote Details

  • Suburb Sunbury, VIC 3429
  • Specialisation Post Hole Digging
  • Date Listed 7 May 2020 - 10:05 am

Similar Quote Requests

10 post holes dug 750 deep with rock in ground
holes are marked out have come across honeycomb rock some 150 down other...

Post hole digging for retaining wall
I need 5 holes to be dug for retaining wall, the holes need to be 1 metre deep.

Stump holes dug
Need stump holes dug some just need clearing with Auger roughly 300mm....

BOBCAT TO REMOVE DIRT FROM BACKYARD AND FRONTYARD
BOBCAT REQUIRED TO REMOVE DIRT FROM BACK YARD TO INSTALL RETAINING WALL AND...