Effie requested 4 quotes from Excavation Experts in Bulleen
Large amount of soil to be moved and backyard levelled to allow easy access to the backyard from inside the house. Currently need to climb up four steps to reach the backyard. Retainer wall to be built all around the perimeter of the excavation. The slope is upwards from the backyard and is very steep. The width of the yard is approx 12 meters and depth about 10 meters (guess not measured!). Also considering a pool so would like advice and quote to take this into consideration.
Contractors Construction Group
HITECH Retaining Walls
Refined Garden Creations
Excavator for crossover this friday 17th of october-
Ripping up a crossover and then taking a load of concrete to clayton tip....
Excavation of crossover
need a crossover cut out in malvern, concrete load taken to the tip. this...
Excavating
Concrete removal and site cut
DIG FOOTINGS FOR 3 TOWNHOUSES
DIG FOOTINGS FOR 3 TOWNHOUSES AND BREAK SOME ROCK