Michael requested 2 quotes from Excavation Experts in Somerville
I have just purchased a block of land with slight fall on it. It will need the whole site cut level prior to building it is approx 800m2 23x18m I think.
Right Now Plant Hire
Wolf70 Excavations
Terracing a sloping block
Terracing the rear yard of a block
Dig out and move soil from backyard to front yard
We have a half dug backyard which needs to be completed. See attached...
Excavation of site
Need approx. 200m3 of sand/soil dig up and moved to another area of site
Driveway excavated (Rye)
Require someone with a small excavator to:
- cut in driveway crossover with...