Angeline requested 3 quotes from Floorers in Margate
Concrete floor requires screeding to level it out before a laminate floor is laid on top. Approx 90m2
Floor levelling
The lower level of the house needs the tiles pulled up and the concrete needs...
Bathroom floor laying and sealing
Bathroom floor needs laying and sealing ready for tiling.
Sealing concrete inside factory unit w/shop approx. 230sq metres
Internal concrete sealing of a w/shop approx area 230 sq metres
Asap prepair/polish concrete internal flooring aprox 35m2 split over 2 levels
I require approximately 35m2 of concrete to be prepared and polished asap....